American Tower bought out Dickland.. I mean Richland… And they started cleaning house.
The mold on the walls is being removed… And the HVAC works now
The gaping holes in the entry panel have been plugged
A door mat!
I’m a happy engineer.
Boo yeah.
They still have some work ahead of them though. The tower’s elevator is hosed.
Unlike Richland, they are actually trying to get it fixed… Dickland had told me before that they wouldn’t even touch it till October. Foul demons. Ding dong the witch is….. Downsized out of a job.
One thought on “So long, and thanks for all the mold.”